Yeah Unfortunately it’s just me, wife, and son, or even more likely, me an engine hoist and floor jacks with some a500 2x4. It needs to go 34” up to clear which is a big ask given what I’m working with. If the wife wasn’t threatening to call the scrap yard I’d just build a gantry crane but don’t have time. No place within an hour drive has any to rent and the one place that does (2.5hr drive) wants $600 for one day. So steering column needs to come out.
Last edited by GoodtimeCharlie; 09/01/21 06:50 PM.