Radiator Mounting 1946 Chevy 1/2 ton P U

Can anyone validate this process?

You will need the following items.
Heavy Springs (2)
Rubber Support Pads (2)
Hex Head Bolts 3/8" X 3" (2)
Washers 3/8" X 1 1/4 diameter (4)
Lock washers 3/8" (2)

Place bolt with washer through radiator support frame
DO BOTH BOLTS AT SAME TIME
Under support frame place rubber pad on bolt
Next install spring
Next install rubber pad
Next install washer
Now place bolt through truck frame
Next install lock washer
Next install nut & tighten to secure radiator mounting frame to chassis
There are 4 small bolts (1/4" X 3/4") that bolt the top of the radiator support rod to the "bull nose" plate.

I need to know if the sequence of parts is correct?
Thanks,
Harold